Some questions and answers about the Waipaoa River Flood Control Scheme.

Why we need to do this work

The flood control scheme upgrade will:

  • Upgrade the existing flood control scheme to a 100-year design event including climate change factors to 2090.
  • Improve resilience against flood events.
  • Protect and improve council’s most valuable asset.
  • Continue to protect the 10,000 hectares of fertile floodplain land. This scheme protects and supports the high yield horticultural uses.

What can I expect during the upgrade?

Fill material is required for the scheme upgrade. This will be sourced from a number of borrow sites located within the section that's being worked on each year. This is typically between the stopbank and the river.

There'll be increased earthworks at these sites as borrow material is excavated and moved to the section of the scheme being upgraded.

All borrow sites will be reinstated when construction is completed.

You may notice truck movements and noise from earthworks during construction.

You may also notice increased activity on sections of the scheme not under construction, as investigation and planning for subsequent construction phases is undertaken.

As the upgrades are completed, the stopbank will be re-sown with grass.

When will the upgrade be done?

The upgrade work will only be done during summer months when river flows are low.

Because the upgrade will affect parts of the flood control scheme as they're worked on, they'll be managed in limited sections at a time, to manage any potential flood risk.

What do I need to do?

If contractors require access to your property, we'll contact you.

The area required for access will be clearly shown on a plan and the term of access required clearly set out.

If you have a licence for any areas of the existing scheme which are being upgraded, you'll be contacted.

The timing of construction on any licenced area will be determined well in advance, so that any crop can be harvested and future plans made by the licensee.  

There may be a reduction in the licence fee for any loss of use during the works. Once construction is completed, any changes to the licence will be discussed and a new license issued.

Will contractors access my property?

Where access is required to part of your property, a clearly defined area of entry will be agreed with you prior to any entry.

Will you repair any damage?

Any part of your property damaged by entry will be reinstated as close to its original condition as possible by the contractor on completion of the works.

Do I have to pay for the work being done?

There's no cost to the property owner or occupier for the work.  Those who wish to take advantage of reinstatement works and upgrade infrastructure such as fences may be able to pay the difference, assessed on a case-by-case basis.

Will this affect my fencing on my property?

Where the work affects an existing boundary fence, a temporary fence will be provided by the contractor to ensure any stock is kept secure. Once construction is complete, the fence will be fully reinstated by the contractor.

What environmental effects will there be during construction?

The contractor is required to manage dust and noise during the physical work.

Once construction's completed, the stopbank will be re-sown with grass.

Noise will be limited to earthworks machinery during construction.

Borrow sites for material to build the stopbanks will be selected to have least environmental impact on river ecology, fish passage and spawning.

Cultural and archaeological discovery protocols have also been set as part of the resource consent process.

What time of day will the work be done?

Work times will be 7am-7pm Monday to Friday and Saturday mornings 7am-1pm.

There will be no work on any public holidays.

Will my water supply be affected?

We will inform landowners who have a water take that crosses the stopbank about the timing of the work. The work will be managed to minimise disruption to the water supply during construction.

Will a cycleway be built on the stopbanks?

Our priority is to upgrade the stopbank. But we have made provision for cycleways in our resource consent.
We don't have any concept routes for any cycleway along the stopbanks or adjacent land that we can share with you. We will consult with landowners and stakeholders as route options are developed.